
Manager of engineering and construction at the National Iranian South Oil Company (NISOC) said a boosting injection capacity project in Parsi and Karange oil fields is complete and on the verge of pre-commissioning tests. Seyed Abdollah Mosavi made the remarks, adding the project will be operational after passing pre-commissioning phase and conducting safety and technical examinations. The project aims at boosting gas injection to Parsi and Karange reservoirs by 200 mcf/d raising total daily gas injection to 1.1 bcf. On the way of implementation of the project, Mosavi said in order to do the project, two lines of new compressors installed in gas injection stations Karange 500 and Parsi 700 plus laying the related pipelines and wellhead equipments. Located in Khozestan province south of the country Kanage and Parsi oil fields are administered by Agha Jari Oil and Gas Exploration Company.
GMT 22:17 2018 Monday ,22 January
Opec output cuts near victoryGMT 22:57 2018 Saturday ,20 January
the literary canary in India's coalmineGMT 07:11 2018 Friday ,19 January
Oil market heads towards 'smooth rebalancing': OPECGMT 19:07 2018 Saturday ,13 January
Oil hits $70 a barrel for the first time in three yearsGMT 19:07 2018 Saturday ,13 January
Oil hits $70 a barrel for the first time in three yearsGMT 15:44 2018 Saturday ,13 January
Bahrain to host MERTC 2018GMT 18:24 2018 Friday ,12 January
No need to panic over $70 oil price: UAE Energy MinisterGMT 13:21 2018 Friday ,12 January
Kuwaiti oil price up 93 cents to stand at US$66.09 per barrel

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor