bahraini minister inspects wadi alsail primary intermediate girls school
Last Updated : GMT 05:17:37
Emiratesvoice, emirates voice
Emiratesvoice, emirates voice
Last Updated : GMT 05:17:37
Emiratesvoice, emirates voice

Bahraini minister inspects Wadi al-Sail Primary Intermediate Girls' School

Emiratesvoice, emirates voice

Emiratesvoice, emirates voice Bahraini minister inspects Wadi al-Sail Primary Intermediate Girls' School

Bahraini minister Essam bin Abdulla Khalaf
Manama - BNA

Minister of Works Eng. Essam bin Abdulla Khalaf toured Wadi Al Sail Primary/Intermediate School for Girls at the Southern Governorate to inspect work progress, which is now 30% complete. The Minister was accompanied by the Assistant Undersecretary for Construction Projects & Maintenance Eng. Mona Al Motawa, Construction Projects Director Eng. Wadeea Marzooq and a number of engineers from the Ministry.
The Minister was briefed on the latest developments in the project. The construction works for the main school building have been completed, in addition to the pillars for both the ground and first levels.
The Ministry is responsible for the design and supervision of the BD3,759,499 project, for which the Government has allocated a piece of land of a total area of 28.673m2 and a construction land of a total area of 16.626m2.
The four-storey school building comprises 38 classrooms; 22 classrooms for the primary stage and 16 for the intermediate one, with a capacity to accommodate 1000 students. The school also includes multi-purpose laboratories for science, computer, home science and the library, in addition to offices for the teaching and administrative faculty, sports hall, other service facilities such as toilets and store rooms. All classrooms contain all state-of-the-art educational needs. The school also comprises of a multi-purpose hall covering an area of 900m2, a guard room, electricity sub-station, a cafeteria, and outdoor courts for soccer, handball and basketball, which will accommodate students in the morning and residents in the evening.
The school building has been designed based on the latest MoE’s requirements, which include sustainability, green buildings and energy saving measures; such as thermal insulation for roofs and walls, double-glazing windows to reduce noise, sensor taps in bathrooms, energy saving lighting systems, acoustically insulated vinyl flooring, and paints with low volatile and anti-carbon organic compounds to paint walls internally and externally.
The design also takes into account providing all the facilities needed for students and staff with special needs and also pregnant women, such as constructing a special parking lot close to the main school entrance, providing slopes on all entrances, using non-slip vinyl flooring in all rooms, corridors and stairways, in addition to providing 4 elevators close to all entrances and toilets with a size that properly accommodates the needs of those students.
The school has a number of access points on the main roads connected to it; all leading to an inner road designed by MoW’s Roads Planning & Design Directorate. Parking spaces, a bus-stop and a waiting area for students will also be provided.

Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

bahraini minister inspects wadi alsail primary intermediate girls school bahraini minister inspects wadi alsail primary intermediate girls school

 



Name *

E-mail *

Comment Title*

Comment *

: Characters Left

Mandatory *

Terms of use

Publishing Terms: Not to offend the author, or to persons or sanctities or attacking religions or divine self. And stay away from sectarian and racial incitement and insults.

I agree with the Terms of Use

Security Code*

bahraini minister inspects wadi alsail primary intermediate girls school bahraini minister inspects wadi alsail primary intermediate girls school

 



GMT 06:15 2018 Tuesday ,23 January

Volkswagen clinches record sales

GMT 10:19 2016 Monday ,15 August

20 million toilets built in 2 years

GMT 11:07 2014 Thursday ,18 December

Yes, there was a Jewish student at Hogwarts

GMT 08:05 2011 Monday ,03 October

Iran Ups Steel Production by 8%

GMT 05:06 2012 Thursday ,27 September

Arab Open University celebrates 10th anniversary

GMT 11:43 2017 Saturday ,18 March

Marib mosque crime is a real aspect of terrorism

GMT 07:17 2016 Tuesday ,09 February

Obama calls for $1.8bn

GMT 10:25 2015 Wednesday ,23 December

SpaceX landing a 'feat' but not yet a game-changer

GMT 10:51 2017 Friday ,07 July

Bahrain, Indian outstanding relations praised

GMT 23:26 2012 Friday ,11 May

Forces out of Abyei, South Sudan tells UN

GMT 15:24 2016 Tuesday ,13 September

Amazon, Pandora to launch new music streaming services

GMT 09:47 2017 Monday ,09 January

Netanyahu tape probed in graft investigation

GMT 13:00 2016 Wednesday ,12 October

Wu urges foreign adventure for China's flops

GMT 11:08 2017 Tuesday ,28 February

As Olympics loom, China plunges into snow biz

GMT 08:31 2017 Thursday ,02 November

Hotel Review: Waldorf Astoria Beverly Hills
 
 Emirates Voice Facebook,emirates voice facebook  Emirates Voice Twitter,emirates voice twitter Emirates Voice Rss,emirates voice rss  Emirates Voice Youtube,emirates voice youtube  Emirates Voice Youtube,emirates voice youtube

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©

emiratesvoieen emiratesvoiceen emiratesvoiceen emiratesvoiceen
emiratesvoice emiratesvoice emiratesvoice
emiratesvoice
بناية النخيل - رأس النبع _ خلف السفارة الفرنسية _بيروت - لبنان
emiratesvoice, Emiratesvoice, Emiratesvoice