
Japan's Toray Industries said Monday it has agreed to supply carbon fibre materials for Boeing's new 777X jet and the Dreamliner in a 10-year deal worth more than one trillion yen ($8.6 billion).
Toray, the world's top carbon-fibre supplier, said it would build wings for the new jet, a large twin-engine passenger aircraft set for delivery in 2020 that is a successor to the 777.
Investors applauded the deal -- which also includes the extension of an earlier supply agreement for the 787 Dreamliner -- sending Toray's Tokyo-listed shares up 5.18 percent to 850.5 yen, while the broader Nikkei index fell 2.47 percent.
"Toray and Boeing also confirm that the two companies would negotiate an agreement to promote joint development in a wide range of fields including design, materials and parts production to further increase application of carbon fibre composite materials in the aerospace field," a Toray statement said.
Boeing is building a plant in Washington state dedicated to making the 777X's wings and Toray "has been selected for these main wings", it said.
The announcement comes after Toray last year said it would buy smaller US rival Zoltek for about $584 million, on the back of rising demand for carbon fibre materials, which are lighter and stronger than steel and aluminium.
The news on Monday was partly in response to Boeing's plan to ramp up production of the Dreamliner, Toray said.
"With Boeing planning to raise the number of 787 aircraft being produced every month from the current 10 planes to 12 per month in 2016 and 14 per month by the end of the decade -- and the ratio of larger models also expected to increase -- the demand for composite materials also is expected to increase," the Japanese firm said.
Last month, Boeing raised its full-year profit forecast on strong third-quarter earnings, but analysts said investors are worried about high production costs of the signature Dreamliner, which has been hit by a series of troubles.
A battery problem on an All Nippon Airways (ANA) Dreamliner last year forced an emergency landing, which ultimately led to a months-long, worldwide grounding of the plane.
Other faults included problems with an air pressure sensor and the brake system.
Boeing also said earlier this year that hairline cracks have been found in the wings of some of the jets due to a manufacturing problem.
In September, the Japanese probe into the Dreamliner battery problem wrapped up with investigators saying they still had not found the root cause, and neither Boeing nor Japanese battery manufacturer GS Yuasa have been able to pinpoint what caused the battery to overheat.
The domestic ANA flight in January 2013 was forced to make an emergency landing after pilots noticed a burning smell inside the cockpit that was traced to the plane's lithium-ion battery pack.
GMT 09:47 2018 Tuesday ,23 January
SAP unveils big push into French tech start-upsGMT 05:07 2018 Tuesday ,23 January
Noble Group shares surge 37 percent on buyout talksGMT 19:07 2018 Monday ,22 January
BAKS spent Dh225m on charity projects in 2017GMT 22:52 2018 Sunday ,21 January
French firm "recalls baby milk product"GMT 22:27 2018 Sunday ,21 January
US company plans funds that double bitcoin price movesGMT 21:23 2018 Sunday ,21 January
Pence starts Mideast tour in Egypt amid Arab angerGMT 08:54 2018 Saturday ,20 January
Million-euro bill for firm behind Paris bike-share chaosGMT 10:47 2018 Friday ,19 January
German chemical giant BASF sees 'significant' profit leap

Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Maintained and developed by Arabs Today Group SAL.
All rights reserved to Arab Today Media Group 2025 ©
Send your comments
Your comment as a visitor